Smarter Process, Faster Outcomes, Less Stress
Want to know why Euca is best for tiny homes? We’ve streamlined the building journey to be faster, clearer, and more predictable. Our pre-designed, modular cabins & tiny homes are delivered fully built—cutting out months of onsite construction.
While every project will have its own unique requirements, our team has done the groundwork to help streamline the process.
STAGE 1
Design, Quote & Deposit
1-2
WEEKS
STAGE 2
Approvals & Contracts
* Note: Site specific reports for building permits & experts for Town Planning are not included. Our team will support these experts. While our designs are enhanced for compliance outcomes, final approvals will depend on your site.
4-16
WEEKS
STAGE 3
Modular Construction
12-15
WEEKS
STAGE 4
Site Prep & Delivery
< 1
WEEK
Inclusions – Overview
Please refer to the Full List for further details.
Inclusions:
• Design & Planning Workshop
• Project Estimating
• Construction Documentation
• Project Management & Contracts
• NCC Compliant Structure
• Joinery, Fixtures & Fittings
• Screw Pile Footings (flat site, M-type soil)
• Building & Footings Install
Exclusions:
• Permits – Building & Town Planning
• Building Delivery to site
• Building Cranage (if required)
• Service Connections (Power & Water)
• Extra Site Works (see ‘Full Specifications List’ item 4.1.d)
Euca vs. Traditional Construction
Team Procurement
Fully assembled team, contracts already completed.
2-4 weeks of procurement of project partners (architects, builders, suppliers), negotiating, scheduling and contracts.
Design & Pricing
Work already completed with architects, builders & suppliers.
6-8 weeks of design process (meetings, revisions & documentation) and builder material sourcing, pricing & contracts.
Compliance Design
Preliminary assessments completed for engineering, energy efficiency, accessibility and other NCC requirements.
Procurement of a network of compliance experts. Assessment of project and integration of requirements into project design.
Site Disruption
< 1 week footings & building install.
Up to 6 months of onsite noise and activity.
Cost Certainty
Fixed-price build contract
Prone to blowouts, delays and scope changes.
Build Location
Factory built in Geelong.
Built-onsite, weather dependent.
Quality Control
Controlled trades & factory QA.
Variable based on weather, trade availability, site conditions.
Our Modular Factory
Built in Geelong. Delivered Regionally.
Euca has an exclusive agreement with one of Victoria’s largest modular construction facilities to build our tiny homes & cabins. This partnership gives us access to production capacity, skilled trades, and quality control rarely found in small-scale housing.
Our large facility means we can deliver a more predictable, scalable, and efficient process compared to smaller prefab builders. Euca cabins are designed to align directly with this facility’s systems—enabling faster builds and more consistent results.

Modular : The Future of Construction
Off site construction offers advantages for homeowners, investors & tourism operators:
Build & Price