How it works

Smarter Process, Faster Outcomes, Less Stress

Want to know why Euca is best for tiny homes? We’ve streamlined the building journey to be faster, clearer, and more predictable. Our pre-designed, modular cabins & tiny homes are delivered fully built—cutting out months of onsite construction.

While every project will have its own unique requirements, our team has done the groundwork to help streamline the process.

Choose cabin size, finishes and upgrades online or with our expert team.
Schedule a free design & planning consultation (in-person or virtual). This will also help outline potential site specific requirements for the Permits & Approvals stage.
Get your initial quote.
Pay deposit to kick-start planning and/or compliance permit process.
Our team provides the building documentation required to submit your town planning (if required) and building permits.
We’ll work with 3rd party experts for site specific reporting & submission (i.e Town Planning, Bushfire
Assessment, Soil Testing, Energy Rating etc.)*
Finalise a fixed-price contract once permits are approved.
Your cabin(s) are built in our state-of-the-art facility in Geelong.
High-quality local trades complete the structure, fit-out, and testing.
You will receive project updates and photos.
Payments will be staged with key construction milestones.
Site Footings installed.
Cabin is delivered by truck and craned into place.
Final installation and onboarding completed.
Ready to live in or start hosting.

Inclusions – Overview

Please refer to the Full List for further details.

Inclusions:

• Design & Planning Workshop

• Project Estimating

• Construction Documentation

• Project Management & Contracts

• NCC Compliant Structure

• Joinery, Fixtures & Fittings

• Screw Pile Footings (flat site, M-type soil)

• Building & Footings Install

Exclusions:

• Permits – Building & Town Planning

• Building Delivery to site

• Building Cranage (if required)

• Service Connections (Power & Water)

• Extra Site Works (see ‘Full Specifications List’ item 4.1.d)

Euca vs. Traditional Construction

Euca (Modular Build)

Traditional Build

Team Procurement

Fully assembled team, contracts already completed.

2-4 weeks of procurement of project partners (architects, builders, suppliers), negotiating, scheduling and contracts.

Design & Pricing

Work already completed with architects, builders & suppliers.

6-8 weeks of design process (meetings, revisions & documentation) and builder material sourcing, pricing & contracts.

Compliance Design

Preliminary assessments completed for engineering, energy efficiency, accessibility and other NCC requirements.

Procurement of a network of compliance experts. Assessment of project and integration of requirements into project design.

Site Disruption

< 1 week footings & building install.

Up to 6 months of onsite noise and activity.

Cost Certainty

Prone to blowouts, delays and scope changes.

Build Location

Factory built in Geelong.

Built-onsite, weather dependent.

Quality Control

Controlled trades & factory QA.

Variable based on weather, trade availability, site conditions.

Our Modular Factory

Euca has an exclusive agreement with one of Victoria’s largest modular construction facilities to build our tiny homes & cabins. This partnership gives us access to production capacity, skilled trades, and quality control rarely found in small-scale housing.

Our large facility means we can deliver a more predictable, scalable, and efficient process compared to smaller prefab builders. Euca cabins are designed to align directly with this facility’s systems—enabling faster builds and more consistent results.

Modular : The Future of Construction

Faster build times with fixed factory schedules
Minimal disruption on your land
Consistent quality,
Better for the environment—with less waste and transport